OEM Portable Fan Process
A practical OEM project starts with model selection, quantity, logo position, packaging direction, and sample approval before mass production.
- MOQ: 500 pcs for standard OEM programs.
- Sample Lead Time: 5-7 days after artwork confirmation.
- Mass Production: 15-25 days after sample approval.
- Monthly Capacity: 100,000 pcs across portable fan categories.
Customization Options
Common options include logo printing, Pantone color matching, retail box design, manual customization, barcode labels, and export carton marks.
Approval Checklist
Confirm sample color, logo size, product function, charging, packaging artwork, carton details, and shipping documentation before production.